CLIENT: State Enterprise “National Railway Infrastructure Company”
PERIOD: 2014 – 2015
PLACE: Bulgaria, Pirdop-Karlovo
STATUS: Completed
The project includes the following eight operating points (stations), with the kilometer location of the reception buildings, as follows:
(1) Pirdop station – km 83 + 859
(2) Mount Anton – km 90 + 932
(3) Koprivshtitsa station – km 100 + 240
(4) Stryama station – km 106 + 980
(5) Klisura station – km 116 + 117
(6) Hristo Danovo station – km 130 + 430
(7) Sopot station – km 144 + 268
(8) Karlovo mountain – km 149 + 534
and 10 crossings.
The activities to be implemented include the reconstruction of the existing station centralizations in the stations Pirdop, Anton, Koprivshtitsa, Stryama, Klisura, Hristo Danovo and Sopot:
- Complete replacement of the existing cable network in the station;
- Inter-station freedom control with axle counters type 6316 LS (decentralized);
- Replacement of the existing console manipulators in the stations with new ones;
- Delivery and installation of new repeaters for cables in relay rooms;
- Delivery and installation of new power supply cabinets and cabinets with batteries.